Home / Projects / Six-boiler replacement at South Charnwood Leisure Centre
Six-boiler replacement at South Charnwood Leisure Centre
Six Remeha Quinta Ace 115 kW boilers replaced, for Leisure Energy.
Site: South Charnwood Leisure Centre, Syston, Leicestershire, for Leisure Energy
6 × 115 kW
Boilers
Leisure centres and pools
Year
2026
Plant
Six Remeha Quinta Ace 115 kW boilers
Client
Leisure Energy
Status
Finished
The brief
The leisure centre’s existing boilers needed replacing.
What we did
We removed the existing boilers, then supplied and installed six Remeha Quinta Ace 115 kW boilers.
Result
The six new boilers are installed and the job is finished.
Related services
Got a similar project?
Send us drawings, a scope or a short description and we’ll get back to you within 24 hours.
Phone: 0161 564 0895 · Email: projects@echo-es.co.uk
