Home / About us
About Echo Engineering
We’re a family-owned mechanical, electrical and civils contractor based at Gatehead Mill in Delph, Oldham. Since 2013 we’ve delivered more than 300 projects across the UK, mostly in buildings that stay open while we work.
2013
Trading since
300+
Projects delivered
20+
Staff
UK-wide
Scotland and Northern Ireland to London
Our story
2013
Set up in Oldham
Echo was set up in Oldham in 2013 by Jack and Dave, father and son, both with extensive engineering experience. The company was incorporated on 19 November 2013 as Echo Electrical Engineers & Contractors Ltd, and at first specialised in solar PV and electrical installations.
2018
A mechanical division
In 2018 we added a mechanical division.
May 2020
A new name
In May 2020 the company took its current name, Echo Engineering Solutions.
Today
Family-owned, run by Jack
Dave has recently retired, and Jack now runs the family-owned firm. Today we have a team of more than 20, working from Unit 16, Gatehead Mill. Our work has taken us from Scotland and Northern Ireland to London, for energy services companies, leisure operators, hotels and industry.
What we do
We take jobs from first drawings to commissioning, mostly with our own people.
- 3D co-ordinated designWe model the installation in 3D and you approve the drawings before anything is fabricated.
- Prefabricated pipeworkWelded pipework built in our own fabrication workshop, with separate areas for stainless and carbon steel.
- Package plant rooms and skidsPlant built as a package and delivered ready to connect on site.
- M&E site installationHeating (LTHW) pipework, gas, flues and exhaust, ventilation, distribution boards, power and controls.
- CivilsEquipment bases, excavation and buried pipework, and the builders’ work that goes with M&E installations.
- Boiler replacement and plant room fit-outsFor example, six 115 kW boilers replaced at South Charnwood Leisure Centre.
- Water treatmentHydrosphere licensed.
- MicrogenerationHeat pumps (including a Net Zero Pod at Grantham Meres Leisure Centre), CHP units from 50 kW to 1 MW (including 230 kW at Radisson Blu Durham), solar PV and battery storage (BESS). Echo Engineering installs the plant; our sister company Echo Energy supplies and runs the generation.
How we work
We aim to make projects run as smoothly as possible: going above and beyond when it’s needed, being reliable, and doing a good job first time.
Quality
We run our work through documented quality procedures, from enquiry to handover. Pipework designs are approved by you in 3D before fabrication, and our electrical work is certified to BS 7671 as an NICEIC Approved Contractor. At handover you get the test certificates for the job, such as the gas, LTHW pressure and electrical certificates.
Aftercare
We stay involved after handover, with servicing, breakdown support and training so your team knows how to run the systems we’ve installed.
Health and safety
Think Safe. Work Safe. Home Safe.

Think Safe, Work Safe, Home Safe is our own health and safety initiative. It’s about a culture where everyone understands why and how to work safely, rather than safety being enforced compliance.
What it means day to day
- Daily briefings.
- Toolbox talks.
- CPD and regular training.
- Live incident reporting.
- Point-of-work risk assessments.
The record behind it. One RIDDOR-reportable incident in 13 years of trading. Every engineer holds a CSCS card and more than half hold SSSTS or SMSTS. We’re CHAS accredited and retain an independent health and safety adviser.
Our people
We have more than 20 staff, in four teams.
Interested in an apprenticeship? We’re planning our next intake for September 2027.
- ProjectsProject managers and engineers who plan each job and stay with it through to handover.
- Site deliveryField engineers who install the mechanical and electrical work.
- ProductionOur workshop team, who fabricate the pipework.
- OfficeThe team who keep orders, documents and programmes moving.
Apprentices
We’re proud of our apprenticeship record. Over the years we’ve helped more than 16 young people qualify in their trades, and we currently have 4 apprentices at different stages. Our next apprentice intake is planned for September 2027.
Accreditations
Part of The Echo Group
We’re part of The Echo Group, alongside Echo Energy, Gentoo Climate and RAID Environmental.
On generation projects the work is split: Echo Engineering installs the plant (the mechanical, electrical and civils works, through to commissioning), and Echo Energy supplies and runs the generation (CHP and solar PV). Gentoo Climate covers heat pumps, and RAID Environmental covers thermal insulation and asbestos.
Echo Engineering
Installs the plant: the mechanical, electrical and civils works, through to commissioning.
Echo Energy
Supplies and runs the generation (CHP and solar PV).
Heat pumps.
RAID Environmental
Thermal insulation and asbestos.
Talk to us about your project
Send us drawings, a scope or a short description and we’ll get back to you within 24 hours.
Phone: 0161 564 0895 · Email: projects@echo-es.co.uk
Unit 16, Gatehead Mill, Delph New Road, Delph, Oldham OL3 5DB






