Year
2026
CHP size
230 kW
Client
Centrica Business Solutions
Scope
Gas, LTHW, heat trim and radiators, ventilation, exhaust, electrical, insulation
Certificates
Gas test and purge, LTHW pressure test and electrical test, November 2026
The brief
Centrica Business Solutions needed a new 230 kW combined heat and power (CHP) unit at Radisson Blu Durham, connected into the hotel’s existing heating, gas and electrical systems.
What we did
We delivered the full M&E package:
- Decommissioning
- Gas installation
- LTHW pipework, heat trim and radiators
- Ventilation
- Exhaust
- Electrical installation, including the CHP electrical supply
- Thermal insulation
We planned the work around the hotel, including lagging done in weekend slots agreed with the client.
Result
The CHP was installed and tested. The gas test and purge, LTHW pressure test and electrical test certificates were handed over in November 2026.
“We’ve used Echo Engineering as a trusted supplier for more than 10 years. They’re responsive, reliable and their engineers are excellent. Most recently they installed the 230 kW CHP at Radisson Blu Durham, planning the work around a working hotel. Whatever the job, they deliver a great result every time.”
James Prescott, Senior Project Manager, Centrica