Home / Projects / Net Zero Pod heat pump at Grantham Meres Leisure Centre

Net Zero Pod heat pump at Grantham Meres Leisure Centre

A new, decarbonised heating system, installed in 2 months with minimum disruption, for Leisure Energy.

Site: Grantham Meres Leisure Centre, Grantham, Lincolnshire, for Leisure Energy

Net Zero Pod

Heat pump

Leisure centres and pools

Year

2026

Plant

Net Zero Pod heat pump

Programme

2 months

Electrical

New distribution board and circuits for pool filtration pumps and controls

Client

Leisure Energy

The brief

The leisure centre’s heating needed decarbonising, with as little disruption to the centre as possible.

What we did

We installed a Net Zero Pod heat pump, giving the centre a new heating system. We also fitted a new distribution board and circuits for the pool filtration pumps and control panels in the pool pumphouse, certified to BS 7671.

Result

A new, decarbonised heating system, installed in 2 months with minimum disruption to the centre.

Got a similar project?

Send us drawings, a scope or a short description and we’ll get back to you within 24 hours.

Phone: 0161 564 0895 · Email: projects@echo-es.co.uk