Home / Projects / 125 kW CHP at Fenton Leisure Centre

125 kW CHP at Fenton Leisure Centre

Designed in 3D, pipework fabricated off site, and just 17 days on site with no health and safety incidents.

Site: Fenton Leisure Centre, Stoke-on-Trent

125 kW

CHP

Leisure centres and pools

Year

2021

CHP size

125 kW

Time on site

17 days

Health and safety

No incidents

Approach

3D design, off-site fabrication, CDM duties

The brief

The centre needed a new 125 kW CHP unit installed while it stayed open, with as little disruption as possible.

What we did

We produced 3D co-ordinated designs for the client to approve before fabrication, then fabricated the pipework off site. Our own team installed the stainless steel exhaust, LTHW pipework, ventilation and electrics, and we took on the CDM duties.

Result

We spent just 17 days on site, thanks to off-site fabrication, and finished without any health and safety incidents.